Minor Metals in the Periodic Table

Please select an element to find out more

 
Print this page

Sb - Antimony (Russian)

Origin

Russia / CIS

Tariff No.

8110 0011

Quality

Sb 99.60 % min.
As 0.05 % max.
No other elements specified. If specific grades are contracted the following shall apply:

  CY 2 CY0 CYOO CY 000 CY 0000  
Sb 98.8 99.6 99.9 99.99 99.999 %min.
As 0.2 0.02 0.001 0.0004 0.0002 %max.
Pb 0.6 0.2 0.03 0.0006 0.0001 %max.
Fe 0.2 0.02 0.01 0.0004 0.0002 %max.
S 0.1 0.05 0.01 0.0005 0.00005 %max.
Sn 0.1 0.02 0.02 0.0001 0.00005 %max.
Zn 0.1 0.005 0.005 0.0005 0.00005 %max.
Cu 0.1 0.005 0.005 0.000005 0.000005 %max.

Unless contracted at the time of negotiation, other elements above do not give Buyer right to reject and may only form the basis for further discussion in the event material assays outside of these maxes.

Form

Ingots (regulus), with no specific dimension or weight.

Packaging

Original producer's packing, normally ingots on pallets. The actual net weight of the packing is not relevant, unless otherwise agreed.

Lot Size & Tolerance

5 MT (+/- 2%)

Documentation

Standard documentation, as per MMTA Consolidated Regulations.

Weighing & Sampling

As per MMTA Consolidated Regulations.

Other Notes

This form is based on the old Soviet Union CY 0 GOST Norm. Unless otherwise specified at the time of contracting, the minimum quality that can be expected is CY 0, with Sb 99.60% min., As 0.05% max.

 

 ............................................... (sampling and assaying guidance below is optional)...................................

 

Inspection Schedule

Open all containers, note any different markings on form or indications of heterogeneity. 

Sampling Schedule

If there are no indications of material heterogeneity then sample on an incremental basis of 10 MT sub lots. If heterogeneity is suspected select the incremental groups accordingly but in sub lots of 10 MT or less.
Select 10% of the ingots schematically, drill each ingot using a predetermined template which accounts for the whole of the ingot form.
Where heterogeneity or contamination is suspected it may be considered necessary to segregate certain ingots and prepare samples separately.

Sample Preparation

The drillings from each incremental sub lot should be mixed, drillings or pieces subdivided if necessary, to produce a homogeneous bulk sample in each instance.
Two options are then open:
1. Quality samples can be drawn from each homogenised sub lot bulk sample for analysis.
2. Alternatively a composite can be prepared from portions of each of the sublots to give a total parcel bulk sample from which total parcel quality samples may be drawn.

Antimony Metal Norms

..........................................................  

REACH Consortia

International Antimony Association, Avenue de Broqueville 12, 5th floor, 1150 Brussels, Belgium
www.iaoia.org

..........................................................  

Economics and Facts

  1. USGS (various)
  2. Hard Asset Investor (2009)
  3. Metal Bulletin report (2007)

Mining Journal report (2005)

 

 
 

© Copyright Minor Metals Trade Association 2008

terms & conditions | legal statement

 

Site designed and powered by Cyber